Jeff Ray
December 1st, 2005, 12:11 PM
Hey guys,
This is my second music video.
Shot on a soundstage at Austin Studios, this will be my last music video to be shot on a stock XL2. I've got a new music video I'm shooting at the end of December with a proper budget, so I'll be switching to the Panasonic SDX900 w/Pro35 adapter, which will be nice.
Anyway, this was a gruesome three day shoot. My brother and I built all the sets ourselves from scratch (walls, props, set dressings, you name it, we did it), and that took us 48 hours straight without sleep. After finishing the sets, we went right into shooting for 15 hours, so basically we began filming extremely tired and I DO believe it affected the overall product (some of the dolly shots look downright horrid to me), but we had no choice as our studio time was restricted to 3 days, and 3 days only (the new Texas Chainsaw Massacre movie was set to move in the day after)....so all in all, no sleep for three days.
But I digress, this music video was edited in Final Cut Pro 5 with heavy effects placed on the entire video (which caused considerable lag in my harddrive, but it was necessary).
So here's the link to the video(www.suitedproductions.com/jpriceband.html), the band is called J. Price. You can also go to our main webpage at www.suitedproductions.com to check out some of the other stuff I've done (including my first music video).
This is my second music video.
Shot on a soundstage at Austin Studios, this will be my last music video to be shot on a stock XL2. I've got a new music video I'm shooting at the end of December with a proper budget, so I'll be switching to the Panasonic SDX900 w/Pro35 adapter, which will be nice.
Anyway, this was a gruesome three day shoot. My brother and I built all the sets ourselves from scratch (walls, props, set dressings, you name it, we did it), and that took us 48 hours straight without sleep. After finishing the sets, we went right into shooting for 15 hours, so basically we began filming extremely tired and I DO believe it affected the overall product (some of the dolly shots look downright horrid to me), but we had no choice as our studio time was restricted to 3 days, and 3 days only (the new Texas Chainsaw Massacre movie was set to move in the day after)....so all in all, no sleep for three days.
But I digress, this music video was edited in Final Cut Pro 5 with heavy effects placed on the entire video (which caused considerable lag in my harddrive, but it was necessary).
So here's the link to the video(www.suitedproductions.com/jpriceband.html), the band is called J. Price. You can also go to our main webpage at www.suitedproductions.com to check out some of the other stuff I've done (including my first music video).