Robert Bale
September 13th, 2012, 02:47 AM
Hi, i am working my way through CS6 slowly, i am having one problem , thats is on export, when i used FCP i could do a full wedding, the go file export current settings, and out put the HD QT file,ProRes Lt (to Keep for Backup) it only took about 20mins for a 1hr wedding. Now is CS6 if i try to export something HD QT File its wanting to take 5 hrs . This can't be right, ?? can it. Or should i export a HQ Vimeo setting and Keep it on File ?
The only time i need to re use the master HD QT File, is if i have deleted the original footage , and the bride called me 2 months later and lets me know she wants something fixed or cut out. I normally just open a new FCP sequence, and drop the HD File onto the time line, fix what i need to fix, and re burn her a new DVD.
I hope that makes sense, sorry to bug you all about it but i can't seem to work out how or which way to do this.
Notes, i am not using Previews or Maximum Render setting
The only time i need to re use the master HD QT File, is if i have deleted the original footage , and the bride called me 2 months later and lets me know she wants something fixed or cut out. I normally just open a new FCP sequence, and drop the HD File onto the time line, fix what i need to fix, and re burn her a new DVD.
I hope that makes sense, sorry to bug you all about it but i can't seem to work out how or which way to do this.
Notes, i am not using Previews or Maximum Render setting