first off.....Thanks for reading, I appreciate your help
I went on a long trip, i captured about 100 hours of footage... i have edited that down to about 1 hour, but it references hundreds of clips, from 100 tapes.... basically, i have 99 HOURS of tape that is useless.
Is there any way to render out every clip required (full res) to a new folder, with all of the files premiere needs? i have the rough edit done in premiere, but i need the finess of a proven editor to take over, but i dont want to have to provide all 100 hours of HDV footage.
basically, i have such a HUGE project, that its very dificult to work with multiple editors. i need a way of rendering a smaller amount of data. heck it takes 5 minutes for the project to load on my fast quadcore.
Can any one help me understand a strategy for this?
my initial thought was to create a new segment, put all of the clips ive made in my timeline into one timeline with out any effects... render it... then use that full quality render, and redo (puke) all of my edits, but this time, ill only have 1 hours of footage.
Total project size less than 20 gigs.... current total project size is more than 250 gigs....
i really appreciate your help with this, every modification i make to this process greatly reduces the workload.
I went on a long trip, i captured about 100 hours of footage... i have edited that down to about 1 hour, but it references hundreds of clips, from 100 tapes.... basically, i have 99 HOURS of tape that is useless.
Is there any way to render out every clip required (full res) to a new folder, with all of the files premiere needs? i have the rough edit done in premiere, but i need the finess of a proven editor to take over, but i dont want to have to provide all 100 hours of HDV footage.
basically, i have such a HUGE project, that its very dificult to work with multiple editors. i need a way of rendering a smaller amount of data. heck it takes 5 minutes for the project to load on my fast quadcore.
Can any one help me understand a strategy for this?
my initial thought was to create a new segment, put all of the clips ive made in my timeline into one timeline with out any effects... render it... then use that full quality render, and redo (puke) all of my edits, but this time, ill only have 1 hours of footage.
Total project size less than 20 gigs.... current total project size is more than 250 gigs....
i really appreciate your help with this, every modification i make to this process greatly reduces the workload.