Heath McKnight
February 25th, 2009, 12:06 PM
I am checking the hour meters on a BVW-200A Sony BetaCam, and it comes up as three different sets of numbers:
A: 8xxx
B: xxxx
C: xxxx
Can someone help me translate this?
Thanks,
Heath
Adam Gold
February 25th, 2009, 12:49 PM
Usually A would be total power-on time, B would be time the drum has run, and C would be the total time tape has been running through the cam. Usually these are expressed in 10-hour increments. If there's a D it would be total times a tape has been loaded/unloaded.
Perhaps someone has a service manual and can confirm this.
Heath McKnight
February 25th, 2009, 12:51 PM
Thanks, Adam.
heath