Devin Termini
July 16th, 2008, 12:46 PM
I have a project to edit in 24p. This isn't a problem. However the client has requested DVD materials to be included in the cut. In Final Cut can I convert the 29.97 footage to 23.98 to use in the project?
View Full Version : 29.97 in 24p timeline Devin Termini July 16th, 2008, 12:46 PM I have a project to edit in 24p. This isn't a problem. However the client has requested DVD materials to be included in the cut. In Final Cut can I convert the 29.97 footage to 23.98 to use in the project? |